翻訳と辞書 |
FM Consolidated line : ウィキペディア英語版 | FM Consolidated line
The Consolidated line, or C-line, was a series of diesel-electric railway locomotive designs produced by Fairbanks-Morse and its Canadian licensee, the Canadian Locomotive Company. Individual locomotives in this series were commonly referred to as “C-liners”. A combined total of 165 units (123 cab-equipped lead A units and 42 cabless booster B units) were produced by F-M and the CLC between 1950 and 1955. ==Genesis of the C-liner== (詳細はopposed piston diesel engines for United States Naval vessels. Not long after, the company produced a engine that saw limited use in railcar applications on the B&O, Milwaukee Road, and a few other lines. Additionally, two of the 5 × 6s were placed in an experimental center cab switcher locomotive under development by the Reading Railroad (road #87, built in 1939 by the St. Louis Car Company, or SLCC, and scrapped in 1953). A 5 x 6 powered the plant switcher at F-M's Beloit, Wisconsin manufacturing facility. In 1939, the SLCC placed F-M engines in six streamlined railcars, which are known today as the FM OP800. In 1944, F-M began production of its own yard switcher, the H-10-44. Milwaukee Road #760 (originally delivered as #1802), the first Fairbanks-Morse locomotive constructed in their own plant, is now preserved and on display at the Illinois Railway Museum. F-M had yet to produce a railroad road locomotive, or any locomotive prior to the 1944 switcher which was built several years after its conception; all other locomotive producers, except for General Motors (and a few others who manufactured small industrial locomotives), were forced by the government to continue to build reciprocating steam locomotives during much of the war. All national locomotive production was subject to strict wartime restrictions regarding the number and type of railroad-related products they could manufacture (the U.S. Government in the name of the Navy commandeered all F-M O-P production well into 1944). Following World War II, North American railways began phasing out their aging steam locomotives and sought to replace them with state-of-the-art diesel locomotives at an ever-increasing rate due to the impossible economics of steam propulsion. Fairbanks-Morse, along with its competing firms, sought to capitalize on this new market opportunity. In December 1945 F-M produced its first streamlined, cab/carbody dual service diesel locomotive as direct competition to such models as the ALCO PA and EMD E-unit. Assembly of the unit, which was mounted on an A1A-A1A wheelset, was subcontracted out to General Electric due to lack of space at F-M's Wisconsin plant. GE built the locomotives at its Erie, Pennsylvania facility, thereby giving rise to the name “Erie-built”. F-M retained the services of renowned industrial designer Raymond Loewy to create a visually impressive carbody for the Erie-built. The line was only moderately successful, as a total of 82 cab and 28 booster units was sold through 1949, when production was ended. A nine-month strike by the Beloit, WI shop forces right at the beginning doomed the project. The Erie-built’s successor was to be manufactured in Beloit and designed from the ground up; the result of this effort was the Consolidated line, which debuted in January 1950.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「FM Consolidated line」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|